Subject: Metrolink under construction Location: Manchester Street, Oldham Date: 12-Apr-2013
Topsoil is being added to the cutting sides as the tramway starts to take shape at this location. The view here is dominated by the two tower blocks Summervale House and Crossbank House.
NIKON CORPORATION NIKON D700, f/11 @ 50 mm, 1/500, ISO 2000, No Flash