OTC0180_31996
Subject: Metrolink under construction
Location: Oldham Mumps
Date: 8-Sep-2012
The trackwork is complete across the road junction but the first tram is about six weeks away. As can be seen on this and other pictures during the period, it was very hard to illustrate the changes as the many barriers and traffic cones made it hard to get a clear picture of what was happening. Vantage points were also very limited.
NIKON CORPORATION NIKON D700, f/14 @ 50 mm, 1/800, ISO 1600, No Flash
Category:Transportation
Subcategory:Buses
Subcategory Detail:
Keywords:Mumps, Oldham
© David Beilby