Thank you for your patience while we retrieve your images.
Taken 5-Jul-13
Visitors 4


M005_33064

During the work at Leipziger Platz (seen in the gallery on the 3 route) a new temporary track was laid to completely by-pass the worksite. This temporary track was secured to the road surface in the same way as done with temporary crossovers (Kletterweiche), but was rather difficult to illustrate when trams were running over.
NIKON CORPORATION NIKON D700, f/11 @ 50 mm, 1/320, ISO 1250, No Flash

Categories & Keywords
Category:Transportation
Subcategory:
Subcategory Detail:
Keywords:Amraser Straße, Austria, Innsbruck, IVB, Track

M005_33064